Week 3
November 2 - November 9

This picture was taken on Thursday, November 7. I should have taken a picture on Friday as part of the roof is now done. It will have to wait until next week's report as most of the house is covered in tarp for the weekend.
I love the way it is coming out, and I'm even getting used to living through it (it will get worse, I know when they start working inside more). The interior partitions are all framed and I was able to climb up and walk through the rooms with our builder on Tuesday. When you enter the house, the staircase will be immediately on the left (it's a closet now). At the top of the stairs will be the guest bedroom (the two windows you see in the front left of the house). Then the hallway bathroom. The girls' rooms are in the back left corner of the house. The right half of the house is the master bedroom suite. The doorway you see is the entry to the master bedroom. The area above the bay window is the master bathroom. All bedrooms have walk-in closets. The upstairs hallway overlooks the entry way. Very dramatic!