<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
	
	<channel>
		<title>Grew's Views</title>
		<link>http://grewdesign.com/blog/index.php</link>
		<description>Where I muse about architecture...</description>
		<language>en</language>
		<managingEditor>webmaster@grewdesign.com</managingEditor>
                <copyright>Copyright 2008</copyright>
		<generator>Pivot Pivot - 1.40.1: 'Dreadwind'</generator>
		<pubDate>Mon, 06 Oct 2008 04:57:06 +0000</pubDate>
		<ttl>60</ttl>
		
		
		
		
		<item>
			<title>HELPING CLIENTS FIND THE RIGHT PROPERTY</title>
			<link>http://grewdesign.com/blog/pivot/entry.php?id=7</link>
			<comments>http://grewdesign.com/blog/pivot/entry.php?id=7#comm</comments>
                        <description><![CDATA[ <span style="color: #888888; font-family: Arial; line-height: 15px" class="Apple-style-span">Our firm is not a real estate brokerage but we can do a lot to help clients find the land, house, or building that will best suit their needs.&nbsp;</span><span style="color: #888888; font-family: Arial; line-height: 15px" class="Apple-style-span">One of the&nbsp;most valuable&nbsp;services we provide is helping our clients perform proper due diligence. I can&#39;t tell you how many times we have found that properties listed by licensed real estate agents had open permits that were never closed out, lacking certificates of occupancy for part or all of the building, serious structural problems with either foundation or framing, potential for hazardous materials to be present, problems with compliance with zoning regulations, and a host of other issues that can affect the selling price, make a client decide not to pursue it, or give us a realistic understanding of what the total investment will be if our client goes forward with the purchase. Home inspectors, real estaste inspectors, and real estate agents are limited in the advise and knowledge they have about a property and often do not have the ability to understand the implications of these issues for the prospective owner whether it involves renovations or new construction. So if you are planning construction for the property you are buying be sure to&nbsp;pay for&nbsp;the assistance of your architect up front so you don&#39;t have to pay more later.</span> ]]></description>
			<guid isPermaLink="false">7@http://grewdesign.com/blog/pivot/</guid>
			<category>default</category>
			<pubDate>Mon, 06 Oct 2008 04:55:00 -0000</pubDate>
		</item>
		
		
		
		<item>
			<title>BIG LAWSUIT WIN FOR DEVELOPER</title>
			<link>http://grewdesign.com/blog/pivot/entry.php?id=6</link>
			<comments>http://grewdesign.com/blog/pivot/entry.php?id=6#comm</comments>
                        <description><![CDATA[ <div>
<font face="Arial" size="2"><span class="796541417-15112007">Some time ago we were involved in the planning of a large multi-family housing development and provided the architectural design of the buildings. The Town of Branford was not very welcoming of our proposal as we worked our way through inland wetlands and planning and zoning commissions. In fact, the Town wound up taking the property by eminent domain in order to stop the development. Well, the protracted litigation has concluded and our client, New England Estates, LLC, has won what will amount to a judgment of about $20,000,000 against Branford. The Town will, no doubt, appeal but the case is solid and I believe will probably be upheld.</span></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007">If you are interested in seeing how things transpired, there is a special website that our clients&#39; attorneys have posted so that the residents of Branford can see where their officials took them. Here is the link:</span></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007"><a href="http://branfordtaborrecord.com/index.html"  rel='external'>http://branfordtaborrecord.com/index.html</a></span></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007">Shipman &amp; Goodwin, the attornery for the developer also have the case on their firm website here:</span></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007"><a href="http://www.shipmangoodwin.com/News/Detail.aspx?news=58"  rel='external'>http://www.shipmangoodwin.com/News/Detail.aspx?news=58</a></span></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007">The New Haven Independent has written a lot of articles about the ongoing case. Here is a link to a listing of the articles for reviewing:</span></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007"><a href="http://www.newhavenindependent.org/fastsearch?blogs=5%2C8%2C9&amp;query=new+england+estates"  rel='external'>http://www.newhavenindependent.org/fastsearch?blogs=5%2C8%2C9&amp;query=new+england+estates</a></span></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007">
<div>
<font face="Arial" size="2"><span class="796541417-15112007">Here is&nbsp;our front elevation of one of the typical buildings that had 6 dwelling units:</span></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007"><!-- error: could not display image fairways.bmp.file. File does not exist --></span></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div>
<div>
<font face="Arial" size="2"><span class="796541417-15112007">Needless to say this project will not be built on the site in Branford. So we will be looking around for another place to use our design. If you know of one, let us know. At least this is one of the unbuilt projects that still had a happy ending.</span></font>
</div>
</span></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div>
<div>
<font face="Arial" size="2"></font>
</div> ]]></description>
			<guid isPermaLink="false">6@http://grewdesign.com/blog/pivot/</guid>
			<category>default</category>
			<pubDate>Tue, 08 Jul 2008 05:31:00 -0000</pubDate>
		</item>
		
		
		
		<item>
			<title>A SMALL SUCCESS STORY</title>
			<link>http://grewdesign.com/blog/pivot/entry.php?id=5</link>
			<comments>http://grewdesign.com/blog/pivot/entry.php?id=5#comm</comments>
                        <description><![CDATA[ <div>
<font face="Arial">Back in 2000 our clients purchased a small Cape Code style home in Rowayton, the waterside community within Norwalk, CT for $285,000. However, it became quickly evident that the house would not be large enough for them and their new twin sons.</font>
</div>
<div>
</div>
<div>
<font face="Arial">In June, 2003 we were contracted to design an expanded and completely renovated house on the same site. Other than having to maintain the basic front footprint of the house, the&nbsp;existing basement, and first floor framing,&nbsp;we were able to design a new house in its place. Our cost estimates indicated that the construction could be accomplished within a budget of $500,000 which was really all they could afford at that time. </font><font face="Arial">We also handled all permitting including a variance from the Zoning Board of Appeals, zoning for working in the costal flood zone, and building permit.</font>
</div>
<div>
</div>
<div>
<font face="Arial">The owners had builders in mind that they wanted to bid on the job. So they took care of getting bids from them and sadly all of the bids came in substantially over budget. So we had disappointed clients and a problem on our hands. However, we also provide General Contracting services. So we went to work pricing the job with our own subcontractors and what do you think we found? We would be able to construct the project for $450,000! The bank&#39;s appraiser concluded that the house would be worth about $1,400,000 upon completion. Not a bad investment!</font>
</div>
<div>
</div>
<div>
<font face="Arial">The next problem was that there was a very narrow window within which to complete the project. We had&nbsp;less than 6&nbsp;months to build the project from December 7, 2003 to May 15, 2004 while they would be temporarily staying in a nearby home.</font>
</div>
<div>
</div>
<div>
<font face="Arial">With the great assistance of Forest Homes Westconn, the carpentry subcontractor, we were able to have the family move in when they needed to and just have punch list items to finish up afterwards. It took close coordination of subcontractors and tight monitoring of the schedule.</font>
</div>
<div>
</div>
<div>
<font face="Arial">Well, the twins have been growing and need a yard. The Rowayton location was very convenient for the husband&#39;s hobby of deep sea fly fishing but isn&#39;t much for play space around the house. They have found another home in Redding on several acres with an in ground pool. Our house in Rowayton was put up for sale and will be closing for very nearly the asking price of $1,575,000. Not a bad investment!</font>
</div>
<div>
</div>
<div>
<font face="Arial">Here is the testimonial of our clients in their own words:</font>
</div>
<div>
</div>
<span class="500242502-24112007">
<div>
<table border="0" width="422" style="width: 422px; height: 602px">
	<tbody>
		<tr bgcolor="#99cc00">
			<td colspan="3" valign="top" style="width: 401px; background-color: #ffffff">
			<p>
			&quot;Working with Grew Design was a pleasure. Our 1100 SF home in Rowayton was bursting at the seams with 3 kids under 3 years of age. A plan was formulated by my wife and myself to locate an architect that could understand the meaning of deadline, budget, and functionality. Many of the homes in our area are pretty to look at but lack the functional requirements of a comfortable home. We met with over 20 such architects before meeting Greg Grew. Greg understood that the project that we proposed would require us to relocate for 6 months maybe more. He also understood that we had a tight budget that had very little room for mistakes. The Grew Design team created the perfect home for us for our specified budget. We told him a price that we wanted to spend and they designed it for that. The scope was extensive, requiring many variances; Grew Design handled all the legal aspects with ease.&quot; <br />
			<br />
			&quot;The house was being transformed from a 1920&#39;s (1100sq ft) summer home on the water in Rowayton to a 3100 SF modern functional masterpiece. Our plans were drafted quickly, professionally and flawlessly. Once the plans were complete we put the project out to bid. All contractors that responded were higher than our estimated budget. Greg Grew decided to build the house for our original project budget. He assembled a team, processed all of the paper work with the city and began on schedule. A verbal timeline was discussed and Greg felt comfortable saying we would be back in the home in 6 months. We had to because the lease on the rental was up in 6 months. Our home passed inspection and was granted a CO on time.&quot; <br />
			<br />
			&quot;The construction started December 7, 2003 and was ready to move in on May 7, 2004. After the sub-zero temps that the construction team braved during the winter of 2004 this is nothing shy of a miracle. I highly recommend Grew Design to anyone that is looking for an architect with an eye for style, an understanding of value, and a concept to succeed. Our kids now have a home that they can grow and enjoy.&quot;
			</p>
			</td>
		</tr>
		<font face="Arial" size="2">
		<tr>
			<td valign="top" style="width: 401px; background-color: #ffffff">&nbsp;</td>
			<td colspan="2" valign="top" style="width: 401px; background-color: #ffffff"><font face="Helvetica, Verdana, Arial" size="2" color="#010207"></font></td>
		</tr>
		<tr>
			<td valign="top" style="width: 401px; background-color: #ffffff">&nbsp;</td>
			<td colspan="2" valign="top" style="width: 401px; background-color: #ffffff"><font face="Helvetica, Verdana, Arial" size="2" color="#010207"></font></td>
		</tr>
		<div>
		Here is the website our client maintained throughout construction for his friends and family to follow the project:
		</div>
		<div>
		<a href="http://www.grewdesign.com/Koopman/33PinePointRd.html"  rel='external'>http://www.grewdesign.com/Koopman/33PinePointRd.html</a>
		</div>
		<div>
		Here is the latest website out client posted to assist with marketing the house:
		</div>
		<div>
		<a href="http://33pinepointrd.com/"  rel='external'>http://33pinepointrd.com/</a>
		</div>
		<div>
		Although small in terms of scale we consider this house to be a real success for us in that:
		</div>
		<ul>
			<li><span class="500242502-24112007">We came in on budget</span> </li>
			<li><span class="500242502-24112007">We came in on time</span> </li>
			<li><span class="500242502-24112007">The family loved living in the house and were very proud of it</span> </li>
			<li><span class="500242502-24112007">The design created real value for the owners</span> </li>
			<li><span class="500242502-24112007">Our fees for design and construction were worth every penny</span> </li>
			<li>Our clients have referred us to others for whom we have worked</li>
		</ul>
		<div>
		This is the kind of flexibility and versatility that Grew Design, Inc. brings to our clients.
		</div>
		</font>
	</tbody>
</table>
</div>
</span> ]]></description>
			<guid isPermaLink="false">5@http://grewdesign.com/blog/pivot/</guid>
			<category>default</category>
			<pubDate>Tue, 08 Jul 2008 03:34:00 -0000</pubDate>
		</item>
		
		
		
		<item>
			<title>EPA: NEW LEAD PAINT RULE COMING</title>
			<link>http://grewdesign.com/blog/pivot/entry.php?id=4</link>
			<comments>http://grewdesign.com/blog/pivot/entry.php?id=4#comm</comments>
                        <description><![CDATA[ <p>
<span class="342294015-23062008"><font face="Arial" size="2">We are providing this news to friends, clients and contractors who are involved&nbsp;in residential remodeling projects, child care facilities, and schools.</font></span>
</p>
<p>
<font face="Arial" size="2">On March 31,&nbsp;<span class="342294015-23062008">2008</span> the Environmental Protection Agency (EPA) issued its final rule on lead-safe work practices<span class="342294015-23062008"> in order to comply with</span> the Residential Lead-Based Paint Hazard Reduction Act of 1992<span class="342294015-23062008">.</span></font>
</p>
<p>
<font face="Arial"><font size="2"><span class="342294015-23062008">This new rule updates older rules and issues new directives. In summary: </span>A new information brochure to be distributed to homeowners; the banning of certain work practices when dealing with lead-based paint; standards for performing renovations that disturb lead-based paint; and required certification and training.</font></font>
</p>
<p>
<font face="Arial"><font size="2"><span class="342294015-23062008">T</span>he new rule&nbsp;accomplish<span class="342294015-23062008">es</span> two&nbsp;<span class="342294015-23062008">things</span>:&nbsp;<span class="342294015-23062008">1) </span>It establishes the methods in which renovations that disturb lead-based paint must be performed, and&nbsp;<span class="342294015-23062008">2) </span>it sets up certification and training requirements for home improvement companies doing those renovations. With certain exceptions, it applies to renovations that disturb lead-based paint in houses, child-care facilities, and schools built before 1978.</font></font>
</p>
<p>
<font face="Arial"><font size="2">The EPA is encouraging contractors to adopt the work practices&nbsp;<span class="342294015-23062008">now that are </span>laid out in the rule, but the rule doesn&#39;t go into effect until April 22, 2010.&nbsp;<span class="342294015-23062008">Starting</span> December 22, 2008 contractors will be required to provide a copy of the EPA&#39;s new lead information pamphlet &mdash; <em><u>&ldquo;Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools&rdquo;</u></em> &mdash; to owners and tenants of buildings that will undergo renovations that disturb lead-based paint. This new pamphlet will replace the one&nbsp;<span class="342294015-23062008">called</span> <em><u>&ldquo;Lead: Protect Your Family,&rdquo;</u></em> which remodel<span class="342294015-23062008">ing contractors</span>&nbsp;have been required to disseminate to clients for the last nine years.<span class="342294015-23062008"> For the last nine years Grew Design has been emailing a PDF of the old pamphlet to our new clients of projects that were covered under the old EPA rule. We will now start to send out the new pamphlet by email to new clients.</span></font></font>
</p>
<p>
<font face="Arial"><font size="2"><strong>WORK PRACTICES</strong> </font></font>
</p>
<p>
<font face="Arial" size="2">The&nbsp;<span class="342294015-23062008">new </span>rule specifically bans&nbsp;<span class="342294015-23062008">the following</span>&nbsp;techniques when renovating an area containing lead paint:</font>
</p>
<ul>
	<li><font face="Arial" size="2">Open flame burning or torching of lead-based paint; </font></li>
	<li><font face="Arial" size="2">The use of machines that remove lead-based paint through high-speed operation such as sanding, grinding, power planing, needle gun, abrasive blasting, or sandblasting, unless such machines are used with HEPA exhaust control; </font></li>
	<li><font face="Arial" size="2">Operating a heat gun above 1,100 degrees Fahrenheit.</font></li>
</ul>
<p>
<strong><font face="Arial" size="2">CERTIFICATION AND TRAINING</font></strong>
</p>
<p>
<font face="Arial"><font size="2">The new rule requires two levels of certification. Once the rule goes into effect, any company undertaking renovations covered under the rule must be certified by the EPA to do so. There is no training for this aspect: Starting on October 22, 2009, firms will send an application plus relevant fees to the agency, which will then evaluate the company on the basis of the environmental compliance history of it, its principals, and its key employees. Firms will be required to renew their certification every five years.<span class="342294015-23062008"> So apparently, Grew Construction LLC will be seeking this certification from the EPA.</span></font></font>
</p>
<p>
<font face="Arial"><font size="2">In addition, each remodeling project covered under the rule must have a certified renovator assigned to it. Individuals wishing to become certified renovators must enroll in a class accredited by the EPA. At a minimum, classes must be eight hours long and feature two hours of hands-on training. Individuals with previous EPA or Department of Housing and Urban Development (HUD) training in lead-safe work practices will be required only to take a refresher course to earn this certification. Certified renovators must renew their certification every five years, though the renewal course will be half as long as the original certification class. Training programs can begin applying for EPA accreditation beginning on April 22, 2009, and individuals may pursue certification as soon as it&#39;s available.<span class="342294015-23062008"> Grew Construction, LLC or Grew Design, Inc. will have staff that will have the required certification for our projects.</span></font></font>
</p>
<p>
<font face="Arial"><font size="2"><strong>CERTIFIED RENOVATORS</strong> </font></font>
</p>
<p>
<font face="Arial"><font size="2">As&nbsp;<span class="342294015-23062008">noted above</span>, each project that falls under the new rule must have a certified renovator assigned to it. That individual is not required to perform the renovation or even be on site for all of it, though he or she must be present for certain stages. The certified renovator is responsible for providing on-the-job training to anyone who is not a certified renovator themselves and who will be working on the project. They must also be available &mdash; if not on site, then by phone &mdash; at all times while the renovation is taking place.<span class="342294015-23062008"> This will not be a problem for either Grew Design or Grew Construction.</span></font></font>
</p>
<p>
<font face="Arial" size="2">The rule essentially identifies six stages of the project:</font>
</p>
<ul>
	<li><font face="Arial"><font size="2"><strong>Occupant protection.</strong> Signs that define the work area and caution people to remain outside it must be posted before the project starts and remain posted until the very end. The certified renovator must be present for this step. </font></font></li>
	<li><font face="Arial"><font size="2"><strong>Containment.</strong> The rule lays out extensive requirements for isolating the work area to prevent dust and debris from escaping while work is being performed. The certified renovator assigned to the project must be present while containment is established. </font></font></li>
	<li><font face="Arial"><font size="2"><strong>Renovation.</strong> Individuals working on the project must follow the lead-safe work practices previously mentioned. As noted, the certified renovator does not have to be present for the entire renovation, but must provide on-the-job training to workers and must be reachable at all times while work is being done. </font></font></li>
	<li><font face="Arial"><font size="2"><strong>Waste management.</strong> The rule establishes involved processes for ensuring that lead dust doesn&#39;t contaminate beyond the work area. All personnel and items leaving the work area must be free of dust and debris, and all waste must be properly contained. </font></font></li>
	<li><font face="Arial"><font size="2"><strong>Cleanup.</strong> Individuals cleaning the work area at the end of the project must be trained in the proper techniques, which include the use of HEPA vacuums. </font></font></li>
	<li><font face="Arial"><font size="2"><strong>Cleaning verification.</strong> One of the more controversial aspects of the proposed rule from two years ago was the &ldquo;white glove test,&rdquo; in which renovators would be required to wipe down surfaces in the work area with a damp white cloth and compare it to a cleaning verification card provided by the EPA. If the color of the cloth matched or was lighter than the card, the surface was clean; if darker, the surface would have to be recleaned and then retested, with the process repeating until the cloth matched the card.</font></font></li>
</ul>
<p>
<font face="Arial" size="2">After a visual inspection confirming that there is no visible dust on the surface, the certified renovator &mdash; this is the one part of the process that person must do themselves &mdash; must wipe it with a wet cloth and compare it to the cleaning verification card. If the cloth is darker than the card, the surface must be recleaned and then retested with a fresh wet cloth. If the cloth still doesn&#39;t pass the test, the certified renovator must wait one hour or until the surface dries, whichever is longer, then wipe it with a dry cloth. Once that step is complete, the project will be considered clean, and no further testing is required.</font>
</p>
<p>
<font face="Arial" size="2">Records asserting that the regulations were followed must be kept by the renovation firm for three years.</font>
</p>
<p>
<span class="342294015-23062008"><font face="Arial" size="2">Our firm does not provide any legal advice or counseling and the above it merely our understanding of the new EPA rule and how it will apply. We encourage you to review the material yourself at the EPA&#39;s lead paint website: <a href="http://www.epa.gov/lead/"  rel='external'>http://www.epa.gov/lead/</a></font></span>
</p>
<p>
<span class="342294015-23062008"><font face="Arial" size="2">This is not an issue that will affect local building codes or permits. It is still an important requirement to comply with. </font></span><span class="342294015-23062008"><font face="Arial" size="2">As we continue to see on the Federal and State levels, codes and regulations continue to become more complicated and require one to keep up to date on their development. The result is a better project for our clients and reduced exposure and liability on our part. This is just one example of how Grew Design seeks to stay on top of regulatory issues that affect our industry and our clients. If you have questions please feel free to contact us.</font></span></p> ]]></description>
			<guid isPermaLink="false">4@http://grewdesign.com/blog/pivot/</guid>
			<category>default</category>
			<pubDate>Tue, 08 Jul 2008 03:18:00 -0000</pubDate>
		</item>
		
		
		
		<item>
			<title>DOES UNLICENSED = UNKNOWN?</title>
			<link>http://grewdesign.com/blog/pivot/entry.php?id=3</link>
			<comments>http://grewdesign.com/blog/pivot/entry.php?id=3#comm</comments>
                        <description><![CDATA[ <p>
Many people purchase construction drawings for their home using the catalog and mail or internet ordering services. Some of these home design services have hundreds or even thousands of designs to choose from and can charge a very low price, just a few hundred dollars or in the low thousands. Most of these services are led by home designers who are not licensed architects. They may or may not have a lot of practical experience and competence. Usually the principal&#39;s CV is not available and often you don&#39;t even know who the principals are. 
</p>
<p>
Now, I don&#39;t want to sound like a snobbish or elitist architect but here is a list of only a few of the problems I have noticed over the years with such plans purchased by prospective homeowners or spec builders:
</p>
<ul>
	<li>Did not meet local zoning regulations.</li>
	<li>Did not meet local building code criteria for structural loads such as for snow, high winds, frost protection, or coastal sites, depending on where the house was going to be located.</li>
	<li>Did not meet local energy code requirements.</li>
	<li>Did not describe construction methods or materials that are in common use and familiar to local contractors. </li>
	<li>Although the design service claimed otherwise, the plan purchased did not have enough drawings and details for the house to be built properly.</li>
</ul>
<p>
Sadly, at times I have also seen similar problems with house plans prepared by licensed architects, too.
</p>
<p>
 It is very hard to know with the mail or internet order services that you are getting complete, competently prepared construction drawings. That is why I would always recommend a consumer to stay away from them other to look over their designs as a way to understand what you like and don&#39;t like in current home design trends.
</p>
<p>
With local unlicensed home designers you might be able to get a sense of their competence by seeing samples of their plans for other homes in the area, tour some of those homes, get references from clients and contractors who have worked with their plans, and even ask a building inspector if he had to make a lot of corrections or request more information from that designer than what was on the plans at the start. The problem with the unlicensed is that their levels of experience and competence vary so wildly that it would even be hard to know where to start in looking for the right one.
</p>
<p>
With a licensed architect there is at least the baseline understanding that they have met similar requirements of education and/or experience, which are extensive, and have passed a uniform 36-hour long exam given to prospective architects across the country. Still there is plenty of incompetence in this profession and it would be good to find out as much as you can about the architect&#39;s practice and practicality before hiring.
</p>
<p>
Typically there is one reason someone hires an unlicensed home designer- <em><strong>they&#39;re cheaper</strong></em>. That&#39;s it. You often get what you pay for. Why someone would go for the cheapest right from the start on their most important investment is a mystery to me.</p> ]]></description>
			<guid isPermaLink="false">3@http://grewdesign.com/blog/pivot/</guid>
			<category>default</category>
			<pubDate>Wed, 02 Jan 2008 00:32:00 -0000</pubDate>
		</item>
		
		
		
		<item>
			<title>FIRE SAFETY OF ENGINEERED LUMBER OR I-JOISTS</title>
			<link>http://grewdesign.com/blog/pivot/entry.php?id=2</link>
			<comments>http://grewdesign.com/blog/pivot/entry.php?id=2#comm</comments>
                        <description><![CDATA[ <p>
I had a most unusual experience occur recently with a local building inspector that reminded me to question what I do as an architect from time to time.</p><p>
<span>I have been involved in a substantial 7-figure renovation of a house in Westchester Country, NY. During construction it was revealed that a section of the house&rsquo;s second floor joists would have to be replaced. We decided to replace the old 2x8 joists with I-joists (<a href="http://www.apawood.org/level_b.cfm?content=prd_joi_main"  rel='external'>http://www.apawood.org/level_b.cfm?content=prd_joi_main</a>), which can support longer spans. This allowed us to open up the first floor and remove some walls and posts. It was a great solution to the problem.</span> 
</p>
<p>
<span>Then the local building inspector got into it. Upon completing the framing inspection, he asked the builder if they were going to install the fireresistance rated drywall for the ceiling under the I-joists. The builder said he was planning to use regular &frac12; inch drywall and knew about nothing else. Next the builder calls me. Being quite familiar with the NY State Residential Building Code, I confidently tell him not to worry about because using fireresistance rated drywall is not required in the code. Just to make sure I am correct, I check the state code and the local ordinances. I find nothing.</span> 
</p>
<p>
<span>So I send the building inspector an email asking him about his request and telling him I know there is no such code requirement. In part, he writes back:</span> 
</p>
<blockquote>
	<p>
	<span><em>Whenever we receive plans showing TJI&#39;s it is our policy to ask for 5/8&quot; Fire Code Rock covering on all ceilings. It would be a shame to have this residences receive a lesser standard of fire protection than any other in Town&hellip;</em></span> 
	</p>
</blockquote>
<span>Now I am ticked off. We go back and forth and the bottom line is that we are going to have to put in the 5/8&rdquo; fireresistant drywall ceiling or else the building inspector will find some violation to cite at the job for a fine of $2,500. I consult with the builder and homeowner and we agree to comply with his demand to keep the job moving.</span><span>&nbsp;</span><span>However, this matter keeps nagging at me and I finially decide to do my own research in the area of fire safety of I-joists and to send the building inspector an email with my conclusions and criticisms of his way of working. Here is what I wrote to him:</span><span>&nbsp;</span> 
<blockquote>
	<p>
	<em><span>Dear Mr. [Building Inspector]:</span><span>&nbsp;</span></em>
	</p>
	<p>
	<em><span>Based on your strong opinion regarding the lessened fire safety of I-joists, I have been doing more of my own research. A balanced approach seems to be that regular gypsum board cover on I-joist floors is a reasonable cover which gives occupants the time needed to egress a single family house. It is clear that uncovered I-joists are worthless in a fire.&nbsp;The IBC assigns 15 minutes of additional fire endurance to 1/2&quot; regular gyp bd and 25 minutes for 1/2&quot; type x. Various reports and sources make it clear that even noncombustible members behave unpredictably in a fire situation and laboratory results are never like the real situation. Sometimes materials behave better than expected, sometimes worse. It seems, until more definitive results are published and there is more agreement in the industry, it would be wiser to concentrate on regular drywall cover and inspecting for proper bridging, fireblocking, and smoke/heat detection. </span></em>
	</p>
	<p>
	<em><span>Fire reports indicate that a very small percentage of the deaths are attributed to structure collapse and then not all of those due to I-joists. If you were really intent on preserving lives to a higher degree than everyone else you would have gotten the town to enact an ordinance to require residential fire sprinklers like in New Castle, not some unofficial policy like 5/8&quot; type x when the science isn&#39;t really clear that there is any demonstrable benefit. The science and empirical evidence is clear when it comes to the benefit of sprinklers.</span><span>&nbsp;</span></em>
	</p>
	<p>
	<em><span>Short of that I was disturbed by&nbsp;your insinuation that I, as an architect, and every other town in NY and all other jurisdictions that don&#39;t have your policy somehow care less about people&#39;s lives. Because you are a building official in NY and not CT you might not be aware that I am a licensed CT building official besides architect. Since I took the exam about 5 years ago I still hold the record for the highest score in the state and I keep up my license with the 90-hours/3 years continuing education besides the continuing education I pursue for my architectural practice. The only reason I bothered to take the exam, become a licensed building official, is that I do care about codes and standards and their application and enforcement in building design and construction. I do care about the lives of my clients, contrary to your assertion. </span></em>
	</p>
	<p>
	<em><span>What I find disturbing is when code officials take it upon themselves to create their own little parochial &quot;policies&quot;. It is the same as the old fashioned &quot;that&#39;s not the way we do it in my town&quot;. It goes contrary to the entire reason statewide codes and national model codes and standards have been developed. If you feel strongly about an issue or you think the science is all on your side, would it not be better to push for&nbsp;a statewide change or&nbsp;at the ICC level? Or is the argument not strong enough to be accepted by code enforcers at large? Frankly, why stop at just the ceiling cover on I-joists? There are so many things that could be better in houses&nbsp;than the minimums required in the codes. And certainly some others would enhance public health, safety and welfare, too.&nbsp;</span><span>&nbsp;</span></em>
	</p>
	<p>
	<em><span>I have provided in the PDF attachment and items below some of the available information on the subject that make it clear that your 5/8&quot; type x &quot;policy&quot; is not the panacea you may think. I have attached the latest overview report from NFPA (of which I am also a member). It is very revealing because it does not list&nbsp;light construction or I-joists as in issue in resulting deaths or injuries from fires. In fact it indicates that fires have gone down about 50% in the last 25 years. How can that be so at the same time that framing is getting lighter and we are using more engineered lumber and trusses and everyone except&nbsp;[your town]&nbsp;is using 1/2&quot; regular gypsum board? Could it be that what is more important is the increased awareness and enforcement of blocking, penetration seals, and detection? If you have more definitive information I hope you will share it with me so I can be more educated on the subject.</span><span>&nbsp;</span><span>In the meantime, our contractor at [Address withheld] Rd this weekend is either adding the 1/2&quot; type x to the reg layer already on, or his removing that and putting up new 5/8&quot; type x. It depends on how his light trims work out. I thank you for raising the issue so that I would could pursue investigating it myself. I am not quite so convinced as you are of your position but I don&#39;t think that means I care less about people&#39;s safety.</span></em><span>&nbsp;</span> 
	</p>
</blockquote>
<blockquote>
	<blockquote>
		<p>
		<em><span>Here is a site for firefighters with a balanced summary: </span></em><em><span><a href="http://njdfca.com/Reports.html#NJTF1"  rel='external'>http://njdfca.com/Reports.html#NJTF1</a></span><span>&nbsp;</span> </em>
		</p>
		<p>
		<span><em>From </em><a href="http://www.fpl.fs.fed.us/tmu/documents/nltr/nltr0700.htm"  rel='external'><em>http://www.fpl.fs.fed.us/tmu/documents/nltr/nltr0700.htm</em></a><em>, this report shows how divided&nbsp;the experts are about the issue of i-joist fire performance.</em></span> 
		</p>
		<p>
		<span><em>Also see&nbsp;</em><a href="http://www.cloptonrealty.com/newhome.html"  rel='external'><em>http://www.cloptonrealty.com/newhome.html</em></a></span> 
		</p>
	</blockquote>
</blockquote>
<span style="font-size: 10pt; font-family: Arial">I received no initial reply from the building inspector and I figured I had burned my bridges with him. A short time later I came across an article in <a href="http://www.sbcmag.info/mag/mag_index.php"  rel='external'>SBC Magazine</a> about a fire test demonstration that seemed favorable to engineered lumber and I sent it to him. You can read about it here: </span><span><a href="http://www.sbcmag.info/Archive/2007/jan/0701_tour.pdf"  rel='external'>http://www.sbcmag.info/Archive/2007/jan/0701_tour.pdf</a></span><span>The building inspector replied as follows:</span> 
<blockquote>
	<p>
	<span><em>Thank you for sending along the article. It has done little to sell me on the virtues of Trusses in general. This test has been widely discussed in the fire service. Before too much weight is given to this it is important to recognize who is putting on this show. The Manufactures and distributors of Trusses who derive their lively hood from selling this product to the general public have a different agenda than those of us in Code Enforcement and the Fire Service. The article states that a large number of the skeptics in the audience were older Veteran Firefighters and that the New members of the departments easily accepted the results. This does not surprise me because you learn from what you see, if all you have experienced from truss construction is this demonstration then it is easy to believe that they are safe. If however like me you have in excess of 25 years of hands on experience you tend to believe what you see and that is a dramatic departure from what the Industry wants you to believe.&nbsp; I strongly recommend reviewing current and archive articles from Fire Engineering Magazine or any Publication from John Mittendorf. retired Chief of the Los Angles Fire Department regarding Truss Construction. The important thing to remember is that those of us in the Fire Services are not trying to sell you anything and in many cases it is our lives that are put in jeopardy by these products.</em></span> 
	</p>
</blockquote>
<span>Now, this issue has made me start thinking about the industry&rsquo;s quick change over to engineered lumber and whether or not the fire safety issues have been thoroughly investigated. So if any of you who had the patience and interest to read this have more information or sources for me to review please send them on to me. I would love to know what other construction-related professionals think of the fire safety considerations around engineered lumber, especially I-joists.</span><span>&nbsp;</span><span>&nbsp;</span><span>&nbsp;</span><span>&nbsp;</span> ]]></description>
			<guid isPermaLink="false">2@http://grewdesign.com/blog/pivot/</guid>
			<category>default</category>
			<pubDate>Tue, 24 Apr 2007 15:19:00 -0000</pubDate>
		</item>
		
		
		
	</channel>
</rss>
